#11626 Planned Outage - pagure.io network switch updates - 2023-11-17 13:00 UTC
Closed: Fixed with Explanation by kevin. Opened by kevin.

Planned Outage - pagure.io network switch updates - 2023-11-17 13:00 UTC

There will be an outage starting at 2023-11-17 13:00UTC,
which will last approximately 4 hours.

To convert UTC to your local time, take a look at
http://fedoraproject.org/wiki/Infrastructure/UTCHowto
or run:

date -d '2023-11-17 13:00UTC'

Reason for outage:

Network switches in the datacenter that hosts pagure.io will be updated and rebooted. This should result in a small (~20m) break in connectivity.

Affected Services:

pagure.io

Ticket Link:

https://pagure.io/fedora-infrastructure/issue/11626

Please join #fedora-admin or #fedora-noc on irc.libera.chat
or #admin:fedoraproject.org / #noc:fedoraproject.org on matrix.
Please add comments to the ticket for this outage above.

Updated status for this outage may be available at
https://www.fedorastatus.org/


Metadata Update from @phsmoura:
- Issue priority set to: Waiting on Assignee (was: Needs Review)
- Issue tagged with: outage

Metadata Update from @kevin:
- Issue assigned to kevin

This outage was completed.

Metadata Update from @kevin:
- Issue close_status updated to: Fixed with Explanation
- Issue status updated to: Closed (was: Open)

Metadata